Инструкция для Kawasaki Z750S (2004) :: Страница 557 из 571
Service-Instruction.ru
инструкции pdf и руководства пользователя читать онлайн

Инструкция для Kawasaki Z750S (2004)

Инструкция в формате - PDF
Количество страниц - 571 страница
Размер - 11 МБ
Доступно - Бесплатное скачивание
Доступно - Онлайн чтение
background image

APPENDIX 17-17

Cable, Wire, and Hose Routing

1. Camshaft Position Sensor Lead (Run the lead between the convex area of cap center and bolt

head to secure the coupler.)

2. Fan Switch and Horn Lead
3. Air Suction Valve Cap
4. Clutch Cable (Run the cable through forward the water hose.)
5. Vacuum Switch Valve
6. Radiator Hose (Thermostat Housing-Radiator)
7. Coolant Hose (Head-Thermostat Housing )
8. Inlet Air Pressure Sensor
9. Vacuum Hose (Run the vacuum hose under the throttle cables to connect with the inlet air pres-

sure sensor.)

10. Throttle Cable (Decelerator)

11. Throttle Cable (Accelerator)

12. Vacuum Balance Tube
13. Choke Cable (Run the cable through left side of vacuum switch valve hose.)
14. Hose (Vacuum Switch Valve-Air Cleaner)
15. Stick Coil
16. Vacuum Switch Valve Tube
17. Clamp
18. Radiator Fan Lead (Run the lead through forward the coolant hose and over the air pressure

sensor connector.)

19. Ignition Harness
20. To inlet air pressure sensor.
21. Fuel Hose
22. Fuel Pump
23. To vacuum switch valve.
24. Throttle Cable Holder
25. Subthrottle Valve actuator

Оглавление инструкции

Инструкции для мототехника Kawasaki

Популярные инструкции Kawasaki