Инструкция для Kawasaki Z750S (2004) :: Страница 233 из 571
Service-Instruction.ru
инструкции pdf и руководства пользователя читать онлайн

Инструкция для Kawasaki Z750S (2004)

Инструкция в формате - PDF
Количество страниц - 571 страница
Размер - 11 МБ
Доступно - Бесплатное скачивание
Доступно - Онлайн чтение
background image

ENGINE TOP END 5-11

Clean Air System

Vacuum Switch Valve Installation

•

Install the vacuum switch valve so that the vacuum fitting
[A] faces left side.

•

Route the hoses correctly (see Appendix chapter).

Vacuum Switch Valve Test

•

Remove:

Vacuum Switch Valve (see Vacuum Switch Valve Re-
moval)

•

Connect a vacuum gauge [A] and syringe [B] or fork oil
level gauge to the vacuum hoses as shown.

Special Tool - Fork Oil Level Gauge: 57001-1290

Air Flow [C]

•

Gradually raise the vacuum (lower the pressure) applied
to the vacuum switch valve, and check the valve opera-
tion. When the vacuum is low, the vacuum switch valve
should permit air to flow. When the vacuum raises to
valve closing pressure, it should stop air flow.

Spring [A]
Diaphragm [B]
Valve [C]
Low Vacuum [D]
Secondary Air Flow [E]

If the vacuum switch valve does not operate as described,
replace it with a new one.

NOTE

○

To check air flow through the vacuum switch valve, just
blow through the air cleaner hose.

Vacuum Switch Valve Closing Pressure (Open

→

Close)

Standard: 41

∼

49 kPa (310

∼

370 mmHg, 6.0

∼

7.1 psi)

High Vacuum [A]
Secondary air cannot flow [B]

Clean Air System Hose Inspection

•

Be certain that all the hoses are routed without being flat-
tened or kinked, and are connected correctly to the air
cleaner housing, vacuum switch valve, #1 and #4 carbu-
retor holders and air suction valve covers.
If they are not, correct them. Replace them if they are
damaged.

Оглавление инструкции

Инструкции для мототехника Kawasaki

Популярные инструкции Kawasaki