ELECTRICAL SYSTEM 16-69
Meter, Gauge, Indicator Unit
Fuel Level Gauge Inspection
•
Connect the 12 V battery and terminals in the same man-
ner as specified in the “Liquid Crystal Display (LCD) Seg-
ments Check”.
•
Connect a variable rheostat [A] to terminal [4] and [9] as
shown.
•
Check that the number of segment [B] matches the resis-
tance value of the variable rheostat.
Resistance (
Ω
)
Number of Segments
0
∼
16.5
F
6
11.5
∼
34.5
5
26.5
∼
52.5
4
41.5
∼
70.5
3
56.5
∼
88.5
2
71.5
∼
above
E
1
If this display function does not work, replace the meter
assembly.
•
Connect an other variable rheostat [C] to terminal [2] and
[9] as shown.
•
Set the hand tester [D] to the DC 10 V range and connect
it to terminals of the variable rheostat as shown.
•
When the 1 segment [E] appears, adjust the variable
rheostat [C] so that the terminal voltage is less than 5.2 V.
○
Then the 1 and FUEL symbol segments should flush.
If this display function does not flush, replace the meter
assembly.
Tachometer Check
•
Connect the 12 V battery and terminals in the same man-
ner as specified in the “Liquid Crystal Display (LCD) Seg-
ments Check”.
•
The revolutions per minute (rpm) equivalent to the input
frequency is indicated in the oscillator [A] if the square
wave (illustrated as shown) would be input into the termi-
nal [7].
○
Indicates approximately 6 000 rpm in case the input fre-
quency would be approximately 200 Hz.