Инструкция по эксплуатации для Kawasaki Z750S (2004) :: Страница 138 из 571
Service-Instruction.ru
инструкции pdf и руководства пользователя читать онлайн

Инструкция для Kawasaki Z750S (2004)

Инструкция в формате - PDF
Количество страниц - 571 страница
Размер - 11 МБ
Доступно - Бесплатное скачивание
Доступно - Онлайн чтение
background image

3-46 FUEL SYSTEM (DFI)

Main Throttle Sensor (Service Code 11)

Output Voltage Inspection

•

Measure the output voltage at the main throttle sensor
in the same way as input voltage inspection, Note the
following.

•

Disconnect the main throttle sensor (gray) Connector and
connect the harness adapter [A] between these connec-
tors.

Special Tool - Throttle Sensor Harness Adapter: 57001

-1538

•

Start the engine and warm it up thoroughly.

•

Check idle speed to ensure the throttle opening is correct.

Idle Speed

Standard:

1 100 ±50 r/min (rpm)

If the idle speed is out of the specified range, adjust it
(see Idle Speed Inspection in the Periodic Maintenance
chapter).

•

Turn off the ignition switch.

•

Measure the output voltage of the sensor with the engine
stopped, and with the connector joined.

•

Turn the ignition switch ON.

Main Throttle Sensor Output Voltage

Connections to Adapter

Meter (+)

→

R (sensor Y/W) lead

Meter (–)

→

W (sensor BR/BK) lead

Standard:

0.99

∼

1.03 V DC (at idle throttle opening)

4.19

∼

4.39 V DC (at full throttle opening)

If the output voltage is out of the standard, inspect the
main throttle sensor resistance.
If the output voltage is normal, check the wiring for conti-
nuity.

Wiring Connection

ECU Connector [A]

←→

Throttle Sensor Connector [B]

Y/W lead (ECU terminal 2)
BR/BK lead (ECU terminal 14)

ECU Connector [A]

←→

Throttle Sensor Connector [B]

(Immobilizer Equipped Models [C])

Y/W lead (ECU terminal 6)
BR/BK lead (ECU terminal 20)

If the wiring is good, check the ECU for its ground and
power supply (see ECU section).

Оглавление инструкции

Инструкции для мототехника Kawasaki

Популярные инструкции Kawasaki