Инструкция для Kawasaki VULCAN 2000 (2003) :: Страница 341 из 633
Service-Instruction.ru
инструкции pdf и руководства пользователя читать онлайн

Инструкция для Kawasaki VULCAN 2000 (2003)

Инструкция в формате - PDF
Количество страниц - 633 страницы
Размер - 13 МБ
Доступно - Бесплатное скачивание
Доступно - Онлайн чтение
background image

CRANKSHAFT/TRANSMISSION 9-19

Crankshaft/Connecting Rods

Connecting Rod Removal

•

Remove the crankshaft.

•

Remove the connecting rod big end bolts, and take off
the rod and cap along with the bearing inserts from the
crankshaft [A].

NOTE

○

Mark and record the locations of the connecting rods [B]
and their big end caps [C] with the bearing inserts left
attached so that they can be installed in their original
positions.

CAUTION

To prevent damage to the crankpin surfaces, do not
allow the connecting rod bolts to bump against the
crankpins.

Connecting Rod Installation

Big End Cap [A]
Connecting Rod [B]
OUT Mark [C]
Diameter Mark [D]: “ ” or no mark

CAUTION

If the connecting rods, bearing inserts, or crank-
shaft are replaced with new ones, select the bearing
insert and check clearance with a plastigage before
assembling engine to be sure the correct bearing
inserts are installed.

•

Apply molybdenum disulfide oil to the inside [A] of the big
end bearing inserts.

○

The molybdenum disulfide oil is a mixture of engine oil
and molybdenum disulfide grease with a weight ratio (10
: 1).
If bearing inserts are replaced, install them as follows.

○

Do not apply molybdenum disulfide oil to the outside [B]
of the inserts or the inside [C] of the connecting rod and
cap.

○

Install the inserts so that their nails [D] are on the same
side and fit into the recess of the connecting rod and cap.

Оглавление инструкции

Инструкции для мототехника Kawasaki

Популярные инструкции Kawasaki