5-34 ENGINE TOP END
Cylinder Head
•
Be sure the dowel pins [A] are in position.
•
Replace the cylinder head gaskets [B].
○
The front gasket has an “F” mark [C] while the rear gasket
has an “R” mark [D].
○
Install the gasket so that their can be read and be sure
that the projections [E] are in position.
•
Temporarily torque the cylinder head nuts (M10, M12) and
then torque them, folowing the specified tightening se-
quence.
Temporary Torque
M10 Cylinder Head Nuts [F]: 15 N·m (1.5 kgf·m, 11 ft·lb)
M12 Cylinder Head Nuts [G]: 29 N·m (3.0 kgf·m, 21 ft·lb)
Torque - M10 Cylinder Head Nuts [F]: 29 N·m (3.0 kgf·m, 21
ft·lb)
M12 Cylinder Head Nuts [G]: 88 N·m (9.0 kgf·m, 65
ft·lb)
Front Cylinder Head [H]
Rear Cylinder Head [I]
•
Torque the lower cylinder head nuts after the cylinder
head nuts are torqued.
Torque - Lower Cylinder Head Nuts: 25 N·m (2.5 kgf·m, 18
ft·lb)
Cylinder Head Warp
•
Remove the cylinder head (see this chapter).
•
Lay a straightedge across the lower surface of the cylinder
head at several positions.
•
Use a thickness gauge [A] to measure the space between
the straight edge [B] and the head.
Cylinder Head Warp
Standard:
- - -
Service Limit:
0.05 mm (0.002 in.)
If they cylinder head is warped more than the service limit,
replace it.
If they cylinder head is warped less than the service limit,
repair the head by rubbing the lower surface on emery
paper secured to a surface plate (first No. 200, then No.
400).
Valve Clearance Adjustment
NOTE
○
Since the hydraulic lash adjusters constantly maintain
zero clearance, it is not necessary to inspect or adjust
the valve clearance.