ENGINE TOP END 4-7
Clean Air System
Clean Air System Hose Inspection
•
Be certain that all the hoses are routed without being flat-
tened or kinked, and are connected correctly to the air
cleaner housing, silencer, vacuum switch valve, carbure-
tors, and air suction valve covers.
If they are not, correct them. Replace them if they are
damaged.
Vacuum Switch Valve Test
Using the vacuum gauge and a syringe, inspect the vac-
uum switch operation as follows.
•
Remove a vacuum switch valve.
•
Connect a vacuum gauge [A] and syringe [B] or fork oil
level gauge to the vacuum hoses as shown.
Air Flow [C]
Special Tool - Fork Oil Level Gauge: 57001-1290
•
Gradually raise the vacuum (lower the pressure) applied
to the vacuum switch valve, and check the valve opera-
tion. When the vacuum is low, the vacuum switch valve
should permit air to flow. When the vacuum raises to the
level shown below, the valve should stop air flow. When
the vacuum is high enough, air cannot flow through the
valve.
Spring [A]
Diaphragm [B]
Valve [C]
Low Vacuum [D]
Secondary Air Flow [E]
If the vacuum switch valve does not operate as described,
replace it with a new one.
NOTE
○
To check air flow through the vacuum switch valve, just
blow through the air cleaner hose.
Vacuum Switch Valve Closing Pressure (open
→
close)
Standard:
57
∼
65 kPa (430
∼
490 mmHg)
High Vacuum [A]
Secondary air cannot flow [B].