Руководство пользователя для Kawasaki ER5 (2004) :: Страница 166 из 334
Service-Instruction.ru
инструкции pdf и руководства пользователя читать онлайн
background image

8-26 CRANKSHAFT/TRANSMISSION

Transmission

Shift Drum and Fork Installation

•

Insert the shift drum [A] into the crankcase part way, install
the 3rd/4th shift fork [B] with the longer side [C] facing the
neutral switch, i.e., the longer side goes onto the drum
first.

•

Push the shift drum in the rest of the way.

•

Apply a non-permanent locking agent to the threads of
the holding bolts, and tighten them.

Torque - Shift Drum Bearing Holding Bolts: 11 N·m (1.1

kgf·m, 95 in·lb)

•

Put the shift fork guide pin [A] with the pin hole upward
into the 3rd/4th shift fork. The guide pin rides in the middle
groove of the three shift drum grooves.

•

Insert a new cotter pin through the 3rd/4th shift fork and
guide pin from the shorter side of the shift fork, and spread
the cotter pin longer side.

•

Install the washer, spring, gear positioning lever, collar
and nut.

•

Set the shift drum in the neutral position, that is, fit the
gear positioning lever [A] into the detent on the shift drum
cam [B].

•

Install the shift shaft.

•

Apply a little engine oil to the shift rod and shift fork ears.
Insert the shift rod [A], running it through the shift forks
[B], fitting each shift fork guide pin into the shift drum
groove. The shift forks are identical, and must be installed
with their longer sides [C] facing toward the external shift
mechanism.

Оглавление инструкции

Инструкции для мототехника Kawasaki

Популярные инструкции Kawasaki