Инструкция для Kawasaki ER5 (2004) :: Страница 152 из 334
Service-Instruction.ru
инструкции pdf и руководства пользователя читать онлайн
background image

8-12 CRANKSHAFT/TRANSMISSION

Crankshaft/Connecting Rods

Big End Cap [A]
Connecting Rod [B]
Weight Mark, Alphabet [C]
Diameter Mark [D]

•

Apply engine oil to the inner surface of the upper and
lower bearing inserts [A].

•

Apply a small amount of engine oil to the threads [B] and
seating surface [C] of the connecting rod big end cap nuts.

•

Tighten the cap nuts.

Torque - Connecting Rod Big End Cap Nuts: 36 N·m (3.7

kgf·m, 27 ft·lb)

•

Install the crankshaft (see Crankshaft Installation).

Crankshaft/Connecting Rod Cleaning

•

After removing the connecting rods from the crankshaft
clean them with a high flash-point solvent.

•

Blow the crankshaft oil passages with compressed air to
remove any foreign particles or residue that may have
accumulated in the passages.

Connecting Rod Bend/Twist

•

Measure the connecting rod bend.

○

Remove the connecting rod big end bearing inserts, and
reinstall the connecting rod big end cap.

○

Select an arbor [A] of the same diameter as the connect-
ing rod big end, and insert the arbor through the connect-
ing rod big end.

○

Select an arbor of the same diameter as the piston pin
and at least 100 mm (4 in.) long, and insert the arbor [B]
through the connecting rod small end.

○

On a surface plate, set the big-end arbor on V blocks [C].

○

With the connecting rod held vertical, use a height gauge
to measure the difference in the height of the arbor above
the surface plate over a 100 mm (4 in.) length to deter-
mine the amount of connecting rod bend.
If connecting rod bend exceeds the service limit, the con-
necting rod must be replaced.

Connecting Rod Bend

Service Limit:

0.2/100 mm (0.0079/4 in.)

Оглавление инструкции

Инструкции для мототехника Kawasaki

Популярные инструкции Kawasaki