Инструкция по эксплуатации для Kawasaki ER5 (2004) :: Страница 69 из 334
Service-Instruction.ru
инструкции pdf и руководства пользователя читать онлайн
background image

COOLING SYSTEM 3-7

Coolant

•

Remove the reserve tank cap.

•

Fill the reserve tank up to the F level [A] with coolant and
install the cap.

CAUTION

Do not add more coolant above the F level.

•

Install the fuel tank.

•

Install the seat.

Visual Leak Inspection

Any time the system slowly loses water, inspect for leaks.

•

Check the water pump body drainage outlet passage [A]
for coolant leaks.
If the mechanical seal is damaged, the coolant leaks
through the seal and drains through the passage. Re-
place the mechanical seal.
If there are no apparent leaks, pressure test the system.

Cooling System Pressure Testing

CAUTION

During pressure testing, do not exceed the pres-
sure for which the system is designed. The maxi-
mum pressure is 123 kPa (1.25 kgf/cm², 18 psi).

•

Remove the fuel tank (see the Fuel System chapter).

•

Remove the radiator cap, and install a cooling system
pressure tester [A] on the radiator filler neck.

NOTE

○

Wet the cap sealing surfaces with water or coolant to
prevent pressure leaks.

•

Build up pressure in the system carefully until the pres-
sure reaches 123 kPa (1.25 kgf/cm², 18 psi).

•

Watch the gauge for at least 6 seconds. If the pressure
holds steady, the system is all right.
If the pressure drops and no external source is found,
check for internal leaks. Droplets in the engine oil indicate
internal leakage. Check the cylinder head gasket and the
cylinder liner O-rings.

•

Remove the pressure tester, replenish the coolant, and
install the radiator cap.

Оглавление инструкции

Инструкции для мототехника Kawasaki

Популярные инструкции Kawasaki