Руководство пользователя для Kawasaki ER5 (2004) :: Страница 157 из 334
Service-Instruction.ru
инструкции pdf и руководства пользователя читать онлайн
background image

CRANKSHAFT/TRANSMISSION 8-17

Crankshaft/Connecting Rods

Crankshaft Main Bearing Insert Selection

Bearing Insert*

Crankcase Main

Bearing Bore

Diameter Mark

Crankshaft Main

Journal Diameter

Mark

Size Color

Part Number

Journal Nos

92028-1102

2, 3

○

1

Brown

92028-1274

1, 4

92028-1100

2, 3

None

None

Blue

92028-1272

1, 4

○

None

92028-1101

2, 3

None

1

Black

92028-1273

1, 4

*: The bearing inserts for Nos. 2 and 3 journals have oil grooves.

Crankshaft Side Clearance

•

Measure the crankshaft side clearance.

○

Install the lower crankcase half on the upper crankcase
half, and turn the crankcase upside down.

○

Insert a thickness gauge [A] between the upper crankcase
[B] and the crank web [C] at the No.2 and No.3 journals
to determine clearance.
If the clearance exceeds the service limit, replace the
crankcase halves as set.

CAUTION

The upper crankcase half and lower crankcase half
are machined at the factory in the assembled state,
so they must be replaced as a set.

Crankshaft Side Clearance

Standard:

0.05

∼

0.20 mm (0.0020

∼

0.0079 in.)

Service Limit:

0.40 mm (0.0157 in.)

Оглавление инструкции

Инструкции для мототехника Kawasaki

Популярные инструкции Kawasaki