Инструкция по эксплуатации для Kawasaki ER5 (2004) :: Страница 84 из 334
Service-Instruction.ru
инструкции pdf и руководства пользователя читать онлайн
background image

4-6 ENGINE TOP END

Clean Air System

Vacuum Switch Valve Removal

•

Remove:

Fuel Tank (see Fuel System chapter)

•

Remove the clamps [A] and take off the vacuum switch
valve [B].

Vacuum Switch Valve Installation

•

Install the vacuum switch valve so that the air hole [A]
faces downwards.

Air Suction Valve Installation

•

Replace the gasket with a new one.

•

Install the air suction valve [A] so that its wider side [B] of
the reed faces the rear [C].

Torque - Air Suction Valve Cap Bolts: 11 N·m (1.1 kgf·m, 95

in·lb)

Air Suction Valve Inspection

The air suction valve is essentially a check valve which

allows fresh air to flow from the air cleaner into the exhaust
port. Any air that has passed the air suction valve is pre-
vented from returning to the air cleaner.

•

Remove the air suction valves.

•

Visually inspect the reeds [A] for cracks, folds, warps,
heat damage, or other damage.
If there is any doubt as to the condition of the reed, replace
the air suction valve as an assembly.

•

Check the reed contact areas [B] of the valve holder for
grooves, scratches, any signs of separation from the
holder, or heat damage.
If there is any doubt as to the condition of the reed contact
areas, replace the air suction valve as an assembly.

•

If any carbon or other foreign particles have accumulated
between the reed and the reed contact area, wash the
valve assembly clean with a high flash-point solvent.

CAUTION

Do not scrape off the deposits with a scraper as this
could damage the rubber, requiring replacement of
the suction valve assembly.

Оглавление инструкции

Инструкции для мототехника Kawasaki

Популярные инструкции Kawasaki