Инструкция по эксплуатации для Kawasaki ER5 (2004) :: Страница 138 из 334
Service-Instruction.ru
инструкции pdf и руководства пользователя читать онлайн
background image

7-4 ENGINE REMOVAL/INSTALLATION

Engine Removal/Installation

•

Remove:

Battery Negative Lead [A]
Starter Motor Lead [B]

•

Remove:

Oil Pressure Switch Lead [A]
Neutral Switch Lead [B]
Sidestand Switch Lead Connector [C]

•

Support the engine with a stand or jack [A].

•

Remove the engine mounting bolts [B].

•

Remove the downtube bolts [C] and take off the downtube
[D].

NOTE

○

The drive chain will be removed from the output shaft
when removing the engine.

•

Lift up the engine and move it right to free the output shaft
from the drive chain.

•

Remove the engine [A] from the vehicle right side.

Engine Installation

•

Hang the drive chain [A] over the output shaft [B] just be-
fore moving the engine into its final position in the frame.

Оглавление инструкции

Инструкции для мототехника Kawasaki

Популярные инструкции Kawasaki