Инструкция по эксплуатации для Kawasaki ER5 (2004) :: Страница 240 из 334
Service-Instruction.ru
инструкции pdf и руководства пользователя читать онлайн
background image

13-4 STEERING

Handlebar

Handlebar Removal

•

Remove:

Clutch Cable Upper End
Right and Left Handlebar Switch Housing
Throttle Grip
Brake Master Cylinder

•

Unscrew the handlebar mounting bolts [A] and remove
the handlebar [B] and clamp [C].

Handlebar Installation

•

Install the handlebar clamps so that the arrow [A] on the
clamp points to the front.

•

Set the handlebar to match its punched mark [B] to the
lower mating face [C] of the clamp rear part.

•

Tighten the front clamp bolts first, and then the rear clamp
bolts. There will be a gap [A] at the rear part of the clamp
after tightening.

Torque - Handlebar Clamp Bolts: 25 N·m (2.5 kgf·m, 18

ft·lb)

•

The front half of the right and left switch housings [A] has
a small projection [B]. Fit the projection into the small hole
[C] in the handlebar.

•

Install the handlebar switch housing.

Torque - Handlebar Switch Housing Screws: 3.4 N·m (0.35

kgf·m, 30 ft·lb)

•

Install:

Front Master Cylinder (see Brakes chapter)

Rear View Mirror Removal

•

Loosen the lower hexagonal area [A] for tightening to re-
move the rear view mirror from the holder.

CAUTION

Do not force to tighten and/or loosen the upper
hexagonal area (Adapter) [B] with a pair of span-
ners. Disassembly of this area is Not Available.
Non-permanent locking agent [D] is already applied
to the threads of this inner area. Forcible loosen-
ing may damage the adapter and/or the turning
mechanism of the stay [C].

Оглавление инструкции

Инструкции для мототехника Kawasaki

Популярные инструкции Kawasaki