Руководство пользователя для Kawasaki KLE500 (2004) :: Страница 376 из 401
Service-Instruction.ru
инструкции pdf и руководства пользователя читать онлайн
background image

16-62 ELECTRICAL SYSTEM

Junction Box

The junction box [A] has fuses [B], relays, and diodes.

The relays and diodes can not be removed.

Junction Box Fuse Circuit Inspection

•

Remove the left side cover (see Side Cover Removal in
the Frame chapter).

•

Remove the junction box.

•

Pull off the connectors from the junction box.

•

Make sure all connector terminals are clean and tight, and
none of them have been bent.
Clean the dirty terminals, and straighten slightly-bent ter-
minals.

•

Check conductivity of the numbered terminals with the
hand tester.
If the tester does not read as specified, replace the junc-
tion box.

Special Tool - Hand Tester: 57001-1394

Fuse Circuit Inspection

Tester Connection

Tester Reading (

Ω

)

Tester Connection

Tester Reading (

Ω

)

1 - 1A

0

1A - 8

∞

1 - 2

0

2 - 8

∞

3A - 4

0

3A - 8

∞

6 - 5

0

6 - 2

∞

6 - 10

0

6 - 3A

∞

6 - 7

0

17 - 3A

∞

6 - 17

0

Starter Circuit/Headlight Relay Inspection

•

Remove the left side cover (see Side Lover Removal in
the Frame chapter).

•

Remove the junction box.

•

Check conductivity of the following numbered terminals
by connecting the hand tester and one 12 V battery to the
junction box as shown.
If the tester does not read as specified, replace the junc-
tion box.

Special Tool - Hand Tester: 57001-1394

Оглавление инструкции

Инструкции для мототехника Kawasaki

Популярные инструкции Kawasaki