Инструкция для Kawasaki KLE500 (2004) :: Страница 185 из 401
Service-Instruction.ru
инструкции pdf и руководства пользователя читать онлайн
background image

ENGINE REMOVAL/INSTALLATION 8-5

Engine Removal/Installation

•

Pull off the connectors from the engine and free the wiring
from the straps.

Crankshaft Sensor Lead Connector [A]
Alternator Lead Connector [B]

•

Remove:

Battery Negative Lead [A]
Starter Motor Lead [B]

•

Remove:

Oil Pressure Switch Lead [A]
Neutral Switch Lead [B]

•

Support the engine with a stand or jack [A].

•

Remove the engine mounting bolts [B].

•

Remove the frame downtube bolts [C] and take off the
downtube [D].

NOTE

○

The drive chain will be removed from the output shaft
when removing the engine.

•

Lift up the engine and move it right to free the output shaft
from the drive chain.

•

Remove the engine from the vehicle right side.

Оглавление инструкции

Инструкции для мототехника Kawasaki

Популярные инструкции Kawasaki