Руководство пользователя для Kawasaki KLE500 (2004) :: Страница 202 из 401
Service-Instruction.ru
инструкции pdf и руководства пользователя читать онлайн
background image

9-16 CRANKSHAFT/TRANSMISSION

Crankshaft/Connecting Rods

Crankshaft Removal

•

Split the crankcase (see Crankcase Splitting).

•

Remove the clutch housing and the primary chain.

•

Remove the crankshaft with the camshaft chain and pri-
mary chain.

Crankshaft Installation

CAUTION

If the crankshaft, bearing inserts or crankcase
halves are replaced with new ones, select the bear-
ing inserts and check clearance with plastigage
before assembling engine to be sure the correct
bearing inserts are installed.

•

Apply molybdenum disulfide oil to the crankshaft bearing
inserts.

•

Install the camshaft and primary chains on the crankshaft.

•

Align the timing mark [B] on the balancer gear [A] with
the timing mark [B] on the balancer drive gear [C] of the
crankshaft.

•

Assemble the crankcase (see Crankcase Assembly).

Connecting Rod Removal

•

Remove the crankshaft (see Crankshaft Removal).

NOTE

○

Mark and record locations of the connecting rods and
their big end caps so that they can be reassembled in
their original positions.

•

Remove the connecting rod big end cap nuts, and take off
the rod and cap with the bearing inserts from the crank-
shaft.

CAUTION

To prevent damage to the crankpin surfaces, do not
allow the big end cap bolts to bump against them.

Оглавление инструкции

Инструкции для мототехника Kawasaki

Популярные инструкции Kawasaki