ENGINE TOP END 5-25
Valves
Valve Clearance Inspection
•
Refer to the Valve Clearance Inspection in the Periodic
Maintenance chapter.
Valve Removal
•
Remove the cylinder head (see Cylinder Head Removal).
•
Use a valve spring compressor assembly to press down
the valve spring retainer, and remove the split keepers.
Special Tools - Valve Spring Compressor Assembly: 57001
-241 [A]
Valve Spring Compressor Adapter,
22:
57001-1202 [B]
Valve Installation
•
Check to see that the valve [A] moves smoothly up and
down in the guide.
•
Check to see that the valve seats properly in the valve
seat. If it does not, repair the valve seat.
•
Replace the oil seal [B] with a new one.
•
Apply a thin coat of molybdenum disulfide grease to the
valve stem before valve installation.
•
Be sure to install the inner [C] and outer [D] spring seats
under the inner [E] and outer [F] springs.
○
Install the springs so that the closed coil end [G] is facing
toward the valve seat (downwards).
•
Install the spring retainer [H], press it down with the valve
spring compressor assembly, and fit the split keepers [I]
into place.
Special Tools - Valve Spring Compressor Assembly: 57001
-241
Valve Spring Compressor Adapter,
22:
57001-1202
•
Install the other removed parts.
Valve Guide Removal
•
Remove:
Valve (see Valve Removal)
Oil Seal
Spring Seats
•
Heat the area around the valve guide to about 120
∼
150°C (248
∼
302°F), and hammer lightly on the valve
guide arbor [A] to remove the guide from the top of the
head.
Special Tool - Valve Guide Arbor, 5.5: 57001-1021