Руководство пользователя для Kawasaki KLE500 (2004) :: Страница 355 из 401
Service-Instruction.ru
инструкции pdf и руководства пользователя читать онлайн
background image

ELECTRICAL SYSTEM 16-41

Ignition System

Crankshaft Sensor Peak Voltage Inspection

•

Measure the peak voltage of the crankshaft sensor as
follows:

○

Remove the left side cover.

○

Remove the crankshaft sensor connector [A].

NOTE

○

To obtain a correct measurement, the wires as well as
the wire connections must be correct. Take the volt-
age measurement with the proper cylinder compres-
sion (with the spark plugs in the cylinder head). Without
proper compression, a correct measurement cannot be
obtained.

○

Set the tester to the DC10 V range.

○

Connect the peak voltage adapter [A] to the tester, and
connect the adapter terminal to the crankshaft sensor
connector [B] terminal.

Special Tool - Kawasaki Hand Tester: 57001-1394

Needle Adapter Set: 57001-1457
Peak Voltage Adapter: 57001-1415
Type: KEK-54-9-B

Connect

Adapter’s positive (+) terminal

→

yellow wire terminal

Adapter’s negative (–) terminal

→

black wire terminal

○

Turn the starter motor for several seconds and read the
maximum value on the tester.

Crankshaft Sensor Peak Voltage

Standard:

DC 3 V or more

If the peak voltage is lower than the standard, inspect the
crankshaft sensor.

Diodes Inspection

•

Remove:

Lower Right Fairing (see Lower Fairing Removal in the
Frame chapter)

•

Disconnect the diode assembly [A].

•

Zero the hand tester, and connect it to the diode terminal
to check the resistance in both directions.
The resistance should be low in one direction and more
than ten times as much in the other direction. If any diode
shows low or high in both directions, the diode is defective
and the diode assembly must be replaced.

Оглавление инструкции

Инструкции для мототехника Kawasaki

Популярные инструкции Kawasaki