4-60
15 Nm (1.5 m
S
kg) + 90
_
Order
Job name / Part name
Q’ty
Remarks
1
2
3
4
5
Removing the connecting rod
Nut
Connecting rod bolt
Connecting rod
Connecting rod cap
Connecting rod big end bearing
8
8
4
4
8
Remove the parts in the order listed.
Refer to “INSTALLING THE
CONNECTING RODS” section.
Refer to “REMOVING / INSTALLING
THE CONNECTING RODS” section.
For installation, reverse the removal
procedure.
CRANKSHAFT
ENG
CONNECTING ROD