Инструкция для Suzuki GSX-R600 (2006) :: Страница 212 из 517
Service-Instruction.ru
инструкции pdf и руководства пользователя читать онлайн

Инструкция для Suzuki GSX-R600 (2006)

Инструкция в формате - PDF
Количество страниц - 517 страниц
Размер - 48 МБ
Доступно - Бесплатное скачивание
Доступно - Онлайн чтение
background image

FI SYSTEM DIAGNOSIS     4-61

Step 3

1) Remove the AP sensor.
2) Connect the vacuum pump gauge to the vacuum port of the

AP sensor. 
Arrange 3 new 1.5 V batteries in series 

1

 (check that total

voltage is 4.5 – 5.0 V) and connect 

-

 terminal to the ground

terminal 

2

 and 

+

 terminal to the VCC terminal 

3

.

3) Check the voltage between V-out 

4

 and ground. Also, check

if voltage reduces when vacuum is applied up to 53 kPa (400
mmHg) by using vacuum pump gauge. (

Below)

09917-47011: Vacuum pump gauge
09900-25008: Multi-circuit tester set

Tester knob indication: Voltage (

)

Is the voltage OK?

4) After repairing the trouble, clear the DTC using SDS tool.

(

4-27)

YES

• G/Y, R or B/Br wire open or shorted to ground, 

or poor 

P

, 

A

 or 

S

 connection.

• If wire and connection are OK, intermittent trou-

ble or faulty ECM.

• Recheck each terminal and wire harness for 

open circuit and poor connection.

• Replace the ECM with a known good one, and 

inspect it again.

NO

If check result is not satisfactory, replace AP sen-
sor with a new one.

When using the multi-circuit tester, do not storongly
touch the terminal of the ECM coupler with a needle
pointed tester probe to prevent the terminal damage
or terminal bend.

V

3

3

(Black)

(Gray)

ECM couplers (Harness side)

Оглавление инструкции

Инструкции для мототехника Suzuki

Популярные инструкции Suzuki