Инструкция для Zyxel Prestige 791R EE :: Страница 203 из 238
Service-Instruction.ru
инструкции pdf и руководства пользователя читать онлайн
background image

Prestige 791R G.SHDSL Router 

18-2  

Call 

Scheduling 

To delete a schedule set, enter the set number and press 

[SPACE BAR]

 and then 

[ENTER]

 (or delete) in the 

Edit Name

 field. 

 To setup a schedule set, select the schedule set you want to setup from menu 26 (1-12) and press 

[ENTER] 

to see 

Menu 26.1 — Schedule Set Setup

 as shown next.   

Figure 18-2 Schedule Set Setup 

If a connection has been already established, your Prestige will not drop it. Once the connection is dropped 
manually or it times out, then that remote node can't be triggered up until the end of the 

Duration

. 

Table 18-1 Schedule Set Setup  

FIELD DESCRIPTION  EXAMPLE 

Active 

Press [SPACE BAR] to select 

Yes

 or 

No

. Choose 

Yes

 and press 

[ENTER] to activate the schedule set.  

Yes 

 

Start Date 

Enter the start date when you wish the set to take effect in year -
month-date format. Valid dates are from the present to 2036-
February-5. 

2000-01-01 

                              Menu 26.1 - Schedule Set Setup 

Active= Yes 
Start Date(yyyy/mm/dd) = 2000 – 01 - 01 

How Often= Once 

Once: 

  Date(yyyy/mm/dd)= 2000 – 01 - 01 

Weekdays:  

  Sunday= N/A 
  Monday= N/A 

  Tuesday= N/A 

  Wednesday= N/A 

  Thursday= N/A 

  Friday= N/A 

  Saturday= N/A 
Start Time (hh:mm)= 00 : 00 

Duration (hh:mm)= 00 : 00 

Action= Forced On 

                     

                   Press ENTER to Confirm or ESC to Cancel: 

       Press Space Bar to Toggle 

Оглавление инструкции

Инструкции для роутеры Zyxel

Популярные инструкции Zyxel